USGS and NASA engineers were able to alter the normal operating procedures for the L5 back-up solar array drive, enabling the array to provide adequate power for the mission to resume.
Official USGS Press Release.

SharePin on Pinterest0Email this to someoneShare on LinkedIn0Share on Reddit0Share on Tumblr0Tweet about this on TwitterShare on Facebook1kShare on StumbleUpon0

Tags: