USGS and NASA engineers were able to alter the normal operating procedures for the L5 back-up solar array drive, enabling the array to provide adequate power for the mission to resume.
Official USGS Press Release.

SharePin on Pinterest0Email this to someoneShare on LinkedIn0Share on Google+0Tweet about this on Twitter0Share on Facebook863Share on StumbleUpon0

Tags: